Client:
Gatwick Airport limited

Project:
South Terminal Beehive Toilets

Project Detail :

AQ Construction as part of the Toilet Refurbishment Projects were instructed to develop the existing beehive toilets to investigate the potential increase in capacity. Rotating the orientation of the existing toilets, developing the entrance enabled a small increase in capacity.  The drainage infrastructure within this area of the Terminal was the most problematic aspect however, with a pragmatic Gatwick Project Delivery team this was overcome and a further programme of works is scheduled in for 2017 to refurb the existing drainage.  AQ acted as Principle Contractor and delivered the toilets on programme and budget, Project Value £600k