Client:
Gatwick Airport limited

Project:
North Terminal Level 10 Toilets

Project Detail :

AQ Construction as part of the Toilet Refurbishment Projects were instructed to develop the existing arrivals toilets buy encroaching into Terminal office space, rotating the orientation of the existing toilets therefore increasing the capacity by double.  The drainage infrastructure within this area of the Terminal was the most problematic aspect however, with a pragmatic Gatwick Project Delivery team this was overcome.  AQ acted as Principle Contractor and delivered the toilets on programme and budget, Project Value £750k