Client:
Gatwick Airport limited

Project:
ID Centre fit out

Project Detail :

AQ had to come up with a pragmatic and proactive design approach to complete a project which condenses a 10 week project into 30 days.  The team worked closely with Gatwick engineering to agree a scope and schedule so that procurement could be met and the exciting architectural designs could be coordinated to ensure building control and Gatwick standards were met.  The programme was delivered on time and received rave review from Gatwick Hierarchy and gained further exposure from featuring in the centre pages of the Gatwick news magazine (Download Here).

Programme 30 days